<wbr id="xyjro"></wbr>

        <form id="xyjro"><legend id="xyjro"><noscript id="xyjro"></noscript></legend></form>

      1. 中文/EN
        Alternate Text

        BIM

        The Full Life Cycle BIM system of Zhongcheng International is mainly designed for management of the four stages of project: consulting, design, construction and operation. It covers the whole process of project, where the digital model is created, managed and shared for the project under construction.

        • Project Opportunity Research
        • Analysis of Financing channel
        • Analysis of Market Forecast
        • Visual Design
        • Collaborative Management
        • Data Exchange
        • Decision Support
        • Virtual Construction
        • Progress Control
        • Cost Control
        • Security Control
        • Optimization of Scheme
        • Operational Real-time Control
        • Asset Management
        • Safety Emergency Management

        Consultation

        Design

        Building

        Operation

        • Design Institute
        • Equipment Manufacturers
        • Construction Organization
        • Investors
        • Other
        • Alternate Text

          Consultation & Design

          In the early stage of project planning and design, based on BIM technology, simulation analysis is carried out on the project scheme and investment strategy. By visualizing BIM model, we improve the decision-making participation and maximally optimize the project implementation plan.

        • Building

          Using BIM technology the key nodes of the construction model and site arrangement can be perfectly displayed and be associated with core business data in progress, cost, quality, safety and material. Through the construction process simulation, progress schedule and construction scheme, can be optimized to guarantee the smooth completion of the project construction.

          Alternate Text
        • Alternate Text

          Operation

          During the operation&maintenance phase, BIM combines with Internet + GIS + 10T + GPS for infrastructure management and O&M management. Through virtual simulation technology, the input-output efficiency of different O&M schemes can be analyzed and the influence that the operation brings to the maintenance work can be simulated, in order to propose advanced and reasonable O&M plan to support operation decision, operation supervison and tracking.

        • Alternate Text

          Location:Building 2, NO.176 Haier Road

        • Alternate Text

          Telephone:0532-85909188

        • Alternate Text

          Fax:0532-85909189

        OA
        Alternate Text Alternate Text

        Copyright ? 2016 China Integrity International Oceaneering Co. Ltd All rights reserved design dongbaqu

        香港平特一肖王-香港平特一肖网站-香港赛马会六会彩开奖资料