<wbr id="xyjro"></wbr>

        <form id="xyjro"><legend id="xyjro"><noscript id="xyjro"></noscript></legend></form>

      1. 中文/EN
        Alternate Text

        Project for Shandong Hi-Speed Group in middle port area, Weifang port

        Berth #18-#20 of Shandong Hi-Speed Group inthe east operation zone, middle port area of Weifang port include two 50000DWTgeneral berths and two 20000DWT Ro-Ro berths. CIIO has carried out thefeasibility study, preliminary design and construction drawing design of thisproject. The project takes overall consideration of the function requirementsto handle different cargo types such as Ro-Ro passenger, Ro-Ro cargo, Ro-Rovehicle, drop and pull transport and container,,as well as current and futuredevelopment demand, which make it an innovative and technically leadingproject. Meanwhile it grasps the opportunity that the container berth of theplanning west operation zone has not been constructed yet, to arrange acasisson launching and shipping terminal here, solving the problem of thelacking of caisson precast yard. The project lays great significance as amilestone in the development of Weifang port.

        • Alternate Text

          Location:Building 2, NO.176 Haier Road

        • Alternate Text

          Telephone:0532-85909188

        • Alternate Text

          Fax:0532-85909189

        OA
        Alternate Text Alternate Text

        Copyright ? 2016 China Integrity International Oceaneering Co. Ltd All rights reserved design dongbaqu

        香港平特一肖王-香港平特一肖网站-香港赛马会六会彩开奖资料