<wbr id="xyjro"></wbr>

        <form id="xyjro"><legend id="xyjro"><noscript id="xyjro"></noscript></legend></form>

      1. 中文/EN
        Alternate Text

        Wharf project of Xiaomangniu operation zone, Yancheng port

        The 3rd stage wharf project of Xiaomangniuoperation zone, Xiangshui port area, Yancheng port is a"financing+EPC" project, which fully displays CIIO's ability inproject financing and equipment manufacturing. The project is located in thesouth bank of Guanhe River, Xiangshui, Yancheng. Construction content includes four50000DWT berths. The berth length is 900m and the design throughput capacity is8000000 t. Width of the wharf platform is 30m and the structure of beams andslabs on standing piles is used.

        • Alternate Text

          Location:Building 2, NO.176 Haier Road

        • Alternate Text

          Telephone:0532-85909188

        • Alternate Text

          Fax:0532-85909189

        OA
        Alternate Text Alternate Text

        Copyright ? 2016 China Integrity International Oceaneering Co. Ltd All rights reserved design dongbaqu

        香港平特一肖王-香港平特一肖网站-香港赛马会六会彩开奖资料